olegc
10-19-2004, 07:36 AM
I read on Miceage today about the leaky roofs on Main Street and it reminded me of my last visit. During the swim event I was near the flag pole. While waiting forever I was just examining all the buildings - and it appeared to me that the half-circle vents on the Emporium were not finished. Either the paint on top was already peeling and bubbling - or they did not do it at all.
It would be a shame if in fact they took the time and effort to put up all that scaffolding, etc., only to do 90% of the job. I am no house painter but I assume that if you have paint peeling already then it will hasten the deterioration of the work already done.
As to the leaky roofs, well, as we all know you can't tell until it rains, right?
It would be a shame if in fact they took the time and effort to put up all that scaffolding, etc., only to do 90% of the job. I am no house painter but I assume that if you have paint peeling already then it will hasten the deterioration of the work already done.
As to the leaky roofs, well, as we all know you can't tell until it rains, right?